Industry
New Energy
New-energy material plants combine vacuum conveying, dense-phase transfer and precision dosing for cathode, anode and conductive powders under strict cleanliness rules.

Materials we handle
Cathode and anode active materials, conductive additives, binders and their precursors, usually supplied in FIBCs or process vessels and handled under strict cleanliness rules.
Closed transfer
Intake, screening, conveying, dosing and packing are kept in one sealed chain so sensitive powders are not exposed between steps. Wear linings, de-ironing magnets and sealed packing are included where the specification calls for them.
Weighing and mixing
Multi-ingredient weigh systems deliver set weights into mixers or slurry preparation, with recipe management and batch records for traceability. Feeders and hoppers are sized to the powder's flow behaviour, not only its bulk density.
Dust control
Local extraction and pulse-cleaned receivers keep fine cathode and anode dust inside the equipment, protecting both housekeeping standards and downstream filters.
Project scope and export support
Projects can be supplied in stages - a single conveying line first, then dosing and packing as the plant grows. Machines are packed for sea freight and ship with layout drawings, utility requirements, a recommended spare-parts kit and commissioning support.
Screening and de-ironing
Fine active materials are screened after intake and de-ironed before mixing or packing. Both steps stay inside the closed chain, so removing oversize or tramp metal does not open the product path to the room.
Scaling from pilot to production
Many projects start with one conveying line sized for pilot or small-batch output, then add dosing, storage and packing as volumes grow. Equipment and piping are laid out with that expansion in mind so the second stage does not need a rebuild.
Typical challenges
How CYprocess helps
Discuss a new energy project
Share material, capacity and layout — we reply with a practical proposal.





