CYprocess powder handling and pneumatic conveying systems

Trust

Certificates & Factory

Quality documentation and manufacturing capability behind every vacuum conveying and powder handling project.

What we can document for a project

For an engineered order we can prepare the paperwork a plant needs before equipment is accepted: dimensional drawings, an equipment list with materials and finishes, utility requirements for air, power and extraction, and the function checklists used during testing. Material certificates are issued for product-contact parts when the specification asks for them.

Where a project needs a formal handover, factory acceptance and site acceptance checklists can be agreed in advance, so both sides work to the same list on the day of testing. Spare-parts recommendations are issued with the order rather than after commissioning, so consumables can be stocked in time.

What the factory photographs show

The images on this page are taken in our Shanghai engineering and manufacturing base. They show assembly of receivers, hoppers and support frames, the design office where layouts are prepared, and finished equipment before packing. Photographs of installed lines are collected on the projects page.

Where documentation is agreed

The document list is normally fixed at order stage, together with the inspection and test plan, so that nothing is assumed on either side. If a plant works to an internal specification - a hygiene standard, a national pressure rule, a customer template - send it with the enquiry and we will confirm which points we can meet and which need discussion.

Documents are issued in English as standard, with Chinese versions available. Drawings are provided in a format that can be marked up and returned, which keeps revision history in one place rather than across several email threads.

If you need a specific document before placing an order, tell us which one and we will confirm whether it can be supplied.

Documentation

Quality & Compliance

Download company brochure

CE-oriented manufacturing

Export documentation and conformity packs prepared with each engineered order.

ISO-minded quality process

Incoming inspection, pressure / function checks and as-built documentation.

Material certificates

SS304 / SS316L mill certificates available when specified on product-contact parts.

FAT / SAT support

Factory acceptance outlines and site commissioning checklists on request.

GA drawings with quotation Shanghai engineering base

Capability

Factory & Project Wall

Manufacturing, assembly and installed powder handling lines — from vacuum conveyors to complete process packages.

Assembly workshop
Assembly workshop
Manufacturing facility
Manufacturing facility
Engineering & design office
Engineering & design office
On-site vacuum conveying line
On-site vacuum conveying line
Central feeding installation
Central feeding installation
Complete powder processing plant
Complete powder processing plant