New Energy · Dense Phase Conveying

300 m Dense-Phase Transfer for LFP Powder with Ceramic Pipeline

Spray-dried LFP powder conveyed ~300 m by positive-pressure dense phase, with de-ironing and wear-resistant ceramic pipe.

LFP materials producerGuizhou, China2023
300 m Dense-Phase Transfer for LFP Powder with Ceramic Pipeline

Challenge

Spray-dried lithium iron phosphate needed long-distance transfer with low pipe wear and controlled metal contamination.

Solution

CYprocess designed a dense-phase blow-tank system with about 300 m conveying distance, ceramic-lined pipeline sections and downstream de-ironing.

Results

  • Long-distance transfer without open conveyors
  • Reduced wear via dense phase + ceramic pipe
  • De-ironing protects battery-grade purity
  • Stable continuous feed after spray drying

Project Details

Project background

After spray drying, LFP powder had to move a long distance across the plant. Dilute-phase dilute velocity would accelerate pipe wear; open mechanical transfer was unacceptable for dust and purity.

LFP production
LFP plants often need long enclosed powder routes

System design

A positive-pressure dense-phase system (typically 2–6 bar class air supply) moves high solids loadings at lower velocity. Ceramic pipeline sections protect against abrasion. De-ironing is installed before process use or packing.

Dense phase system
Blow-tank dense phase suited to long abrasive routes

Results

The plant achieves reliable ~300 m transfer with controlled wear and cleaner housekeeping versus open conveying.

On-site conveying
Long-route conveying commissioned as a sealed system

Process Flow

Spray Dryer
Dense-Phase Transmitter
Ceramic Pipeline (~300 m)
De-ironing
Process / Storage

Project Gallery

Dense-phase transmitter for abrasive fine powders
Dense-phase transmitter for abrasive fine powders
Long-distance pneumatic pipeline route
Long-distance pneumatic pipeline route
Industrial powder plant integration
Industrial powder plant integration

Start your project

Planning a similar powder handling line?

Share your material, capacity and plant layout. Our engineers will propose a tailored system based on proven project experience.

  • Industry-proven system layouts
  • Equipment selection & quotation
  • Reply within 24 hours